20% Off · First-Time & Seniors20% Off for First-Time Customers & Seniors, Mention This Website When Booking
Claim →Claim Offer →Long bungalow driveways, 1960s unit blocks with shared meters, or a Strathmore double garage — we've got the right approach for each.

Long bungalow driveways, 1960s unit blocks with shared meters, or a Strathmore double garage — we've got the right approach for each.

Trusted brands
Essendon's Californian bungalows are a distinctive build for EV charging jobs: single garage, set well back from the street at the end of a long driveway, with the switchboard mounted near the front porch. The cable run down that driveway is usually the main design decision on the quote.
Around Moonee Ponds, a lot of the housing stock is 1960s and 70s unit blocks with allocated open-air bays and a shared meter bank in a communal cupboard. That's a genuinely different job — it means owners corporation approval, and often a sub-metering conversation about how the charger's usage gets billed back to the right unit.
Further out in Ascot Vale and Strathmore, double garages on standard family blocks are common, which tends to be a more straightforward single-circuit install without the OC layer.

In short
Near Me Electrical installs EV chargers across Essendon, Moonee Ponds, Ascot Vale and Strathmore, from Californian bungalow garages to unit blocks needing owners corporation approval. We check switchboard capacity, handle sub-metering questions for shared supply, and quote a fixed price with a Certificate of Electrical Safety at the end. Call 0405 592 496.
For a typical Essendon bungalow, we run a dedicated 32A circuit from the front switchboard down the side driveway to the rear garage, usually in conduit fixed along the fence line or under eaves to keep it tidy and out of the way of foot traffic.
Because these driveways are often long and single-lane, we plan the conduit route around garden beds, taps and any existing services before starting, so nothing needs redoing later.
Moonee Ponds' older unit blocks typically have a communal switchboard cupboard with individual meters side by side. Installing a charger here means identifying your specific meter and running a dedicated circuit from it to your allocated bay, which usually needs an OC resolution before work starts.
Sub-metering can come into play if the car bay's power was previously unmetered or shared — we can advise on options so your electricity use for charging is billed correctly rather than absorbed into common property costs.
Ascot Vale and Strathmore's family homes with double garages skip most of this — it's a standard supply and switchboard, so approval isn't usually a factor.
How it works
No back-and-forth, no chasing quotes, no cowboy pricing. Enquire today, get a clear fixed price fast, and we'll have a licensed sparky on site, often within the same week.

Quick call, message or online form, takes two minutes. Tell us the job (or the problem) and we'll be straight back to you.
We inspect, then hand you one clear all-in price up front. What we quote is what you pay, zero surprise line items.
A licensed A-Grade electrician does the work to AS/NZS 3000, tests every circuit and leaves your place cleaner than they found it.
On the day, we isolate the relevant supply, run and terminate the new circuit, mount the charger and test it to AS/NZS 3000 before handing over a Certificate of Electrical Safety. For unit block jobs we also confirm with the OC that the install matches what was approved.
Most households here run charging overnight on off-peak rates, and where a home has solar — increasingly common in Strathmore and Ascot Vale — we set the charger to favour daytime charging automatically.

20% off your first job
First-time customers and seniors save 20%, just mention it when you book. Fixed price still quoted up front.
What Melbourne says
"Ben had amazing communication throughout and was the ultra professional installing our new EV charger."
Andrew Muir
Google review, EV charger
"I found Ben through a friend who had previously used him and he was great with our electrical install. He was clear and competitive on pricing, explained everything that needed to be done through all processes and delivered a great install on our cooktop and oven combo, would definitely recommend!"
Jack Jones
Google review, cooktop and oven
"Ben came on a weekend to help me after a switch shorted out my house. I booked him again to replace my smoke detectors. He came when he said he would and left my home spotless. Would happily recommend him - and he’s local."
Jennifer Howard
Google review, smoke detectors
Almost certainly, yes, if the charger draws from common property infrastructure or the shared meter cupboard. We can prepare the technical details your OC needs to approve the install, including where the new circuit runs and how it's metered, so the approval process is as smooth as possible.
If your bay currently shares power with common property or another unit, we can discuss sub-metering options so your charging usage is tracked and billed to you specifically, rather than being absorbed into body corporate costs. It's worth sorting before the charger goes in, not after.
It means a longer cable run than a standard install, which we account for in the quote, but it's a routine job for us in Essendon. We'll route conduit along the fence line or under eaves so the finished result is tidy and doesn't interfere with the driveway itself.
Generally no — these are typically standard single-phase supply with reasonable switchboard capacity, so it's a straightforward dedicated circuit and wallbox install. We'll still check the board first, but most of these jobs don't need load management or an upgrade.